Bookmark and Share

Tags

32nm 40nm 45nm AMD Apple ASUS ATI Atom Blu-ray Business Cypress E-Book Evergreen Fermi Flash Geforce Globalfoundries GT300 Intel Microsoft Nintendo Nokia Nvidia OCZ Radeon Semiconductor Sony SSD USB Windows

News

Nvidia Corp., a leading supplier of discrete graphics processing units, had reportedly received the first working samples of its next-generation high-end chip code-named G80. It usually takes several months before the chip is ready to be produced in volume, but if everything goes as expected, the firm may be ready with its first DirectX 10-compatible chip by fall.

According to a news-story at The Inquirer web-site, Nvidia had received a working sample of the G80 processor back two weeks ago. The web-site claims that this means that Nvidia will be able to launch the new product as soon as in September, 2006, even though, two months is too short timeframe to fully test the chip and ramp up the production.

The first working sample of a chip carries A0 revision, while companies usually launch A2 revisions commercially. It usually takes several – up to 10 – weeks to build a new chip revision, which means that it is unlikely that the G80 would be production-ready by September.

Right now Nvidia does not need a really new product to be made as fast as possible, as currently the firm has the fastest single-card offering on the market – GeForce 7950 GX2, which offers higher-performance than ATI Technologies’ Radeon X1900 XTX. Nevertheless, the company hopes to outstrip ATI and offer the world’s first DirectX 10-compatible graphics chip. Currently, according to the report, Nvidia hopes to have “six-to-eight-week lead over ATI with its new chip”.

Specifications of the G80 chip are not clear. Some sources indicate that Nvidia’s first DirectX 10 chip will incorporate 48 pixel shader processors and an unknown number of vertex shader/geometry shader processors. The Inquirer, however, claims that the G80 has 32 pixel and 16 vertex and geometry shader processors.

Nvidia Corp. does not comment on unreleased products.

Discussion

Comments currently: 2
Discussion started: 07/04/06 04:37:24 AM
Latest comment: 07/05/06 10:42:34 AM

[1-2]

1. 
It'd better be 48/16 or higher if it wants to be competitive after the ATI solution arrives...
[Posted by: hmm  | Date: 07/04/06 04:37:24 AM]

2. 
So if they release the G80 in September it's most likely gonna be a paper launch...

Anyways at least we'll finally see some Benchmarks of the "next-gen" grapic cards (perhaps even some UT2k7 & Crysis DX10 Benches).
[Posted by: mmmh  | Date: 07/05/06 10:42:34 AM]

[1-2]

You must log in to add comments.

Forgot password? Registration

remember me



Related news

Latest News

Wednesday, November 25, 2009

2:36 pm | EA Montreal to Concentrate on High-Def Games, Lower Focus on Wii. Large Video Game Developer to Re-Focus on HD Blockbuster Titles

11:58 am | AMD to Describe 32nm Bobcat Processor at Chip Conference. AMD to Reveal Power Trimming Technologies of Bobcat

Tuesday, November 24, 2009

11:50 pm | Nvidia to Start Shipping Next-Generation Tegra to Developers “Soon”. Nvidia Readies Second-Generation Tegra SoC for Handhelds

10:37 pm | Despite Netbook Popularity, Consumers Still Want Notebooks – IDC. Even in Asia, Consumers Still Prefer Notebooks over Netbooks

4:04 pm | Imagination Intros Processors for “Internet Everywhere” Consumer Electronics. Imagination Presents Connected Processors for CE Devices

3:33 pm | Sub-$99 Blu-Ray Players Black Friday Deals Available, But Not a Lot. Walmart to Sell BD Players for $78 on Black Friday

12:27 pm | Microsoft Sued for Banning Third-Party Xbox Memory Cards. Memory Cards Supplier Sues Microsoft

11:55 am | OCZ to Release External USB 3.0 Solid-State Drive. OCZ USB 3.0 SSD Incoming for Consumer Electronics Show

7:52 am | Nvidia’s CEO Expects Underpowered Mobile Devices to Gain Popularity. PC of the Future – Web-Based Device with 4G Connectivity, Says Chief Exec of Nvidia